Just had a new kitchen extension built. Screed was laid approx two weeks ago, concrete previous week. How long should I leave the floor to dry before laying ceramic floor tiles please? Once dry should I PVA the screed before tiling? if so what mix? Thanks
 
Sponsored Links
Allow one week per 25mm of depth (screed+ Concrete)

Not pva required