lolfelix said:Allow extra time if you have to pick your way through several inches of insulation with an inch-thick layer of dirt on top! Been there, done that. Allow two hours extra for a bath and a Carlsberg Special afterwards.
andrew2022 said:the loft is to be boarded to ill have to out wires in joists.
GrantF said:What about running batons transversely across the joists to raise the floor an inch or two, and leave the cable on top of the joists. Means you dont have to cut away and weaken the joists?
felix said:A joist is under compression at the top and tension at the bottom. For minimum loss of loadbearing capability drill your holes exactly half way down.
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local