Awful build from 1984, no padstone, long 3M lintel has some deflection in it. Builders stuck the original boiler vent less than two blocks directly under the lintel. It's the gable end but the lower wall extends some to a garage.
2013 new boiler was installed with flue above the hole. Do gas safe engineers not do basic structural training? Anyhow the guy clearly couldn't be arsed as the install was terrible.
Outcome... blocks cracked, bricks cracked.
Repair under way.
2013 new boiler was installed with flue above the hole. Do gas safe engineers not do basic structural training? Anyhow the guy clearly couldn't be arsed as the install was terrible.
Outcome... blocks cracked, bricks cracked.
Repair under way.