hello, i am having a kitchen built and was wondering will code 4 lead be ok for the flashing? weather can be a bit fierce here, and how much does need to be safely on the tiles and going up the wall? will approx 9" be ok, 1" in the wall, 3" down the wall and 5" on the tile?
thx in advance
thx in advance