after measuring my tiles out along the work top i am left with half a tile (mosiac)now would i start at the end of the worktop and have the cut tile against the splash back or should i start at the splash back and have the cut tile at the end of the work top? the end of the work top is not a corner it is next to where the fridge is, but i also have the otherside of the splashback to do which would then lead into a corner so bottom line is 2 cut tiles againste the splashback or at each end of the wortops with one leading into a corner? cheers for any replys