- Joined
- 5 Dec 2012
- Messages
- 819
- Reaction score
- 9
- Country
Hi all
Stripping out my bathroom, currently taking off wall tiles but loads of the event underneath the tiles came off so I stripped the bigger wall to the bare brick so I will dot and dab using moisture resistant plasterboard.
To the wall on the left, I'm currently taking tiles off and similar is happening (see pics). Should I also strip this wall to its bare brickwork and dot and dab this wall also? Or should I just plasterboard up to where the bare brickwork can be seen.
Thanks
Stripping out my bathroom, currently taking off wall tiles but loads of the event underneath the tiles came off so I stripped the bigger wall to the bare brick so I will dot and dab using moisture resistant plasterboard.
To the wall on the left, I'm currently taking tiles off and similar is happening (see pics). Should I also strip this wall to its bare brickwork and dot and dab this wall also? Or should I just plasterboard up to where the bare brickwork can be seen.
Thanks