Chatted to the neighbours, the plonkers have installed a downstairs shower/toilet (about 6 weeks ago) smack on top of the route of the sewer that we share.
So looks like I am stuck with putting an access chamber there after all
I have rerouted all the rainwater to the back of the property, where I will have a hopper to pass back into the drain. And have also got the existing waste water from bathroom & kitchen routed into the SVP over the weekend.
So routing the drainage is a lot easier now.
Rough plan of what the drain layout would be now. As you can see the drain run is near on straight to the point of joining existing sewer point.
Daft question of the day, what if I were to use a 'Y' piece instead of the access chamber as the main joining point, as i have the rodding point to access up to the point where the foul run goes into the main sewer??
Your Views
Thanks
So looks like I am stuck with putting an access chamber there after all
I have rerouted all the rainwater to the back of the property, where I will have a hopper to pass back into the drain. And have also got the existing waste water from bathroom & kitchen routed into the SVP over the weekend.
So routing the drainage is a lot easier now.
Rough plan of what the drain layout would be now. As you can see the drain run is near on straight to the point of joining existing sewer point.
Daft question of the day, what if I were to use a 'Y' piece instead of the access chamber as the main joining point, as i have the rodding point to access up to the point where the foul run goes into the main sewer??