Hi All
I’m just about to secure my shower tray (Mira Flight 900/1400) down onto a ply subfloor but have a single high spot of 3mm at one corner (Measured with level and shims). I wanted to avoid having to bed on a weak mix as the tray is v tight to the 3 walls and I’ll likely F%#@£ that up. I’ve got some CT1 I was going to use to secure the tray.
I’ve poured water on the tray and it appears to drain ok. I’ve also checked the inner tray levels toward the trap and both sides appear similar. So, would you crack on or do the bedding thing in the hope the 3mm would be corrected?
hope you can help, this job is dragging!!!
thanks
G
I’m just about to secure my shower tray (Mira Flight 900/1400) down onto a ply subfloor but have a single high spot of 3mm at one corner (Measured with level and shims). I wanted to avoid having to bed on a weak mix as the tray is v tight to the 3 walls and I’ll likely F%#@£ that up. I’ve got some CT1 I was going to use to secure the tray.
I’ve poured water on the tray and it appears to drain ok. I’ve also checked the inner tray levels toward the trap and both sides appear similar. So, would you crack on or do the bedding thing in the hope the 3mm would be corrected?
hope you can help, this job is dragging!!!
thanks
G