On the new register which links to:
http://www.electricalcompetentperson.co.uk/Regulations-Explained
would you agree that the list of notifiable work (England) has been expanded for the benefit of the schemes in that the last three are not in fact notifiable?
circuit alteration or addition in a special location*
installation of one or more new circuits
installation of a replacement consumer unit (fuse box)
rewire of all circuits
partial rewire
new full electrical installation (new build)
For information, the Building Regulation - the actual law:
(6A) A person intending to carry out building work in relation to which Part P of Schedule 1 imposes a requirement is required to give a building notice or deposit full plans where the work consists of—
(a)the installation of a new circuit;
(b)the replacement of a consumer unit; or
(c)any addition or alteration to existing circuits in a special location.”
http://www.electricalcompetentperson.co.uk/Regulations-Explained
would you agree that the list of notifiable work (England) has been expanded for the benefit of the schemes in that the last three are not in fact notifiable?
circuit alteration or addition in a special location*
installation of one or more new circuits
installation of a replacement consumer unit (fuse box)
rewire of all circuits
partial rewire
new full electrical installation (new build)
For information, the Building Regulation - the actual law:
(6A) A person intending to carry out building work in relation to which Part P of Schedule 1 imposes a requirement is required to give a building notice or deposit full plans where the work consists of—
(a)the installation of a new circuit;
(b)the replacement of a consumer unit; or
(c)any addition or alteration to existing circuits in a special location.”