- Joined
- 26 Jul 2015
- Messages
- 294
- Reaction score
- 6
- Country

Redoing kitchen so pulling ceiling down and doing Downlights.
So....above is bathroom and landing. The bathroom is solid tiles other than under the bath then chipboard floorboard. Landing also chipboard.
When they say "Make a JB accessible" how possibly can you do this with a newly plastered ceiling and this sort of config?
Would using Wagos in daisy chain be better?
So....above is bathroom and landing. The bathroom is solid tiles other than under the bath then chipboard floorboard. Landing also chipboard.
When they say "Make a JB accessible" how possibly can you do this with a newly plastered ceiling and this sort of config?
Would using Wagos in daisy chain be better?
Last edited:
