Hi all just after a little advice.
In the process of adding a single storey single skin extension to our existing outhouse, with wall total 8m x3m x 2.6m
Ok so starting to have the founds dugout (going for Strip Foundations), and found a sewer pipe going diagonally across the trench for the footings, now its about a 150mm pipe (by looking down the man hole), but it has previously probably by the council, been encased in thick concreate to around 500mm+ .
So my question is will this have to be bridged over in some shape or form (concrete lintel), or as the depth is going to be thinker than the footings, can I just build over it with aggregate blocks as its already encased in think concreate?
All Advice is appreciated
In the process of adding a single storey single skin extension to our existing outhouse, with wall total 8m x3m x 2.6m
Ok so starting to have the founds dugout (going for Strip Foundations), and found a sewer pipe going diagonally across the trench for the footings, now its about a 150mm pipe (by looking down the man hole), but it has previously probably by the council, been encased in thick concreate to around 500mm+ .
So my question is will this have to be bridged over in some shape or form (concrete lintel), or as the depth is going to be thinker than the footings, can I just build over it with aggregate blocks as its already encased in think concreate?
All Advice is appreciated
Last edited: