Double RCD in a CU have two cables into one purpose made lug (comes as a kit with the CU), that is inserted into the RCD terminal. They do not have two cables rammed into the terminal.
If you mean a Dual-RCD (not 'high integrity') CU, then, if one RCD is adjacent to the main switch, then there's no need for "two cables rammed into a terminal" (or a 'purpose made lug').

However, as I said, in the case of 'high integrity' CUs, there are often "two cables (plus a bus bar lug) rammed into a terminal" of the main switch ...
upload_2020-5-23_2-50-11.png
 
Again..
  • One Wylex CU, metal with eight single pole RCBs & one mainswitch incomer. Three years old.
  • No space either side or on top.
  • Only space under CU which can just fit another identical sized CU.
  • Needs a sub CU under using the mainswitch (incomer) of the top master CU to switch out both. (have only one mainswitch);
  • New sub CU will also be RCBOs, but the new DP.
  • The sub CU can accommodate ten RCBOs, as no incomer fitted.
 
Last edited:
Sponsored Links
You have been told several times.


If you really cannot think of a way yourself, perhaps you should not be doing electrical work.
 
One of these would do it.

Quite tall, but smaller than two separate enclosures, and has one main switch feeding two busbars, each of which has its own sub-main switch or RCD, supplying the busbar which is fitted with MCBs or RCBOs depending on your whim.

The number of circuits supported is the same number as OP said he wanted.
 
You have been told several times.


If you really cannot think of a way yourself, perhaps you should not be doing electrical work.
I have been? Only once by Sunray. Not you for sure. The only thing you have told is attitude.
 
Last edited:
Well - my question regarding RCCBs should have led you to the answer.

John has told you a couple of times.

What is the difference between Sunray's suggestion and putting the wire itself in the terminal?
 
What is the difference between Sunray's suggestion and putting the wire itself in the terminal?
Sunray's is a professional solution, which is the sort of thing I go for, one is not. Stuffing a 16mm or 25mm cable into an RCBO's terminal together with a bus bar lug is not my line.
BTW, I doubt you have ever fitted stacked CUs, as they are rare. Using Sunray's suggestion is a professional work around without having to replace a three year old CU.
 
Then you are deluded.

Substitute connect properly for stuffed.

What is the difference between connecting stacked CUs and any other arrangement?
 
Then you are deluded.

Substitute connect properly for stuffed.

What is the difference between connecting stacked CUs and any other arrangement?
The only deluded one is you. Stacked CUs have special arrangements to extend the tails from master CU to the slave CU - look at the Proteus brochure link I gave. You can see bits of it

This has an existing three year old quality Wylex CU. If there a kit available to convert the CU into a slacked CU master? Maybe someone here knows. The idea was to fit an identical sub CU below because of space limitations, but how to do a work around giving a stacked arrangement was the problem. I could look at all the makers and I am sure one or two could provide dedicated master and slave stacked CUs, two of them....at an horrendous special order price I am sure. The extra cost would be in reality to only provide the interconnecting CU tails mechanism.

Got a professional workaround thanks to Sunray, while keeping the existing CU - just converting it into the master CU simply. Then a new identical CU, which does not cost the earth, with ten slots for DP RCBOs.
 
Last edited:

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top