What can we expect?
The CU is high up on the wall behind an MDF board with 2 opening doors. Just enough room to get the CU cover off to access the cables and see the meter head, (I have been told it is TN-C-S). My main concern is the CU appears to be polycarbonate with no lid over the MCB's because the MDF board is fitted fairly close. It has a Crabtree 100mA ELCB as the main switch.
Could the tester demand a new CU or would this be acceptable?
The landlord has only had the house for the past 5 1/2 years and this will be the first inspection for us and him.
The CU is high up on the wall behind an MDF board with 2 opening doors. Just enough room to get the CU cover off to access the cables and see the meter head, (I have been told it is TN-C-S). My main concern is the CU appears to be polycarbonate with no lid over the MCB's because the MDF board is fitted fairly close. It has a Crabtree 100mA ELCB as the main switch.
Could the tester demand a new CU or would this be acceptable?
The landlord has only had the house for the past 5 1/2 years and this will be the first inspection for us and him.