Atag 24 system boiler, flue and wall mounted in same position as original boiler, removal of CH motorised valve (replace with 2 port valve for HWP), removal of existing pump, fitting of ABV and boiler filter plus radiator flushing ( 2 days). wiring changes to connect to existing smart controls. Price ?
Not many in their right mind would be able to give an accurate price without seeing the job!!
Last edited: