drive with no sub-base

Joined
2 Mar 2006
Messages
38
Reaction score
0
Location
Cornwall
Country
United Kingdom
Hi,
I'm getting a driveway laid on a piece of my lawn to park my van on. The builder has taken away the top soil and levelled it out and says it's now waiting for the concrete of which there will be 4 inches. I asked about a layer of hardcore but he insisted it was not required. Am i being fobbed off here?
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top