I'm laying a new MDPE service pipe to replace the old lead one, and I have no choice but to pass it under a sewer pipe. I see from the regs that it has to be ducted for 1m either side. What form dose the ducting have to take? Can I simply pass the mdpe through a slightly large pipe?
Thanks
ACDC
Thanks
ACDC