just wanted to up date this and thank you for your replies.
after discussions with the builder and him to electricians the price has dropped to £200, but they did add that other bonding was done ie all the new water pipes and ch pipes.
Sorry, i feel i missled you now with my post as i did not realise what had been done, but getting a reduction was good.
after discussions with the builder and him to electricians the price has dropped to £200, but they did add that other bonding was done ie all the new water pipes and ch pipes.
Sorry, i feel i missled you now with my post as i did not realise what had been done, but getting a reduction was good.
