Interesting discussion!
Sorry, my lack of knowledge has confused things a little; the crimped connection is within a square section plastic extrusion with a removable front - therefore trunking?
The setup has boiler, pump and Y plan valve together in the utility room and cylinder stat, room stat receiver and some relay boxes in the airing cupboard then the boiler timer and master switch halfway between. There's quite a lot of cable running between them!
Sorry, my lack of knowledge has confused things a little; the crimped connection is within a square section plastic extrusion with a removable front - therefore trunking?
The setup has boiler, pump and Y plan valve together in the utility room and cylinder stat, room stat receiver and some relay boxes in the airing cupboard then the boiler timer and master switch halfway between. There's quite a lot of cable running between them!