I have fitted a 2 way RCD c/unit to the main supply via Henley block as client having new kitchen and sockets around the house. No space to change existing c/u. Put new c/u in space about 3/4 metre from old but existing cables not long enough to reach. Extended with 40amp connection blocks and put behind wooden board supporting suppliers meter, etc. Compliant?
Also had to put a junction box on wall in utility room. Client told me he intended to box over this section. Compliant?
Lastly, moved cooker point in kitchen and client having a gas hob with electric oven. New outlet accessories fitted. Can I connect a fused conn unit to the cooker outlet connection point to power the gas hob ignition via 2.5mm T&E? Original cable is 6mm. Have got a 40A MCB in new RCD c/u. Hob to be protected with 3amp fuse in FCU.
Many thanks in advance for any help. I am a newly qual electrician and could not find the relevant regs.
Also had to put a junction box on wall in utility room. Client told me he intended to box over this section. Compliant?
Lastly, moved cooker point in kitchen and client having a gas hob with electric oven. New outlet accessories fitted. Can I connect a fused conn unit to the cooker outlet connection point to power the gas hob ignition via 2.5mm T&E? Original cable is 6mm. Have got a 40A MCB in new RCD c/u. Hob to be protected with 3amp fuse in FCU.
Many thanks in advance for any help. I am a newly qual electrician and could not find the relevant regs.