I'm not questioning his ability im asking if the price is right or close ish.
There's no such thing as the right price.

Every builder will have his own ideas. They'll pay their guys differently, rate their output differently and have different ideas of how big a percentage to add for OH&P. Even pay different prices for the same materials

If you trust the guy then it's the right price, at least that's his price. Go elsewhere, get a cheaper price and a crap stressfilled job or a lovely job at less cost. You won't know which untill the end

Biggest question is did all the previous work stay on budget?
 
I had a 6 x 3 m extension in 2019 total cost £40k, included a builder for the shell, floor but not flooring, windows, door, couple of small walls took down, new drive, removal of spoil. I organised plaster boarding and skim, new kitchen circuits and C/U, then diy kitchen and grand daughters partner for plumbing, boiler and bathroom (mates rates).
 
You must have some idea as your first comment was it's too cheap.



Yep, and he asks for nothing upfront.
It was a general point that the price a builder quote depends on many variables. It seems very cheap to me but then I'm in Essex.

The principle risk of the low price is money up front, poor quality of work, searching for extras failing to complete.

It sounds as though these are not issues here so you need to decided if you want to take these risks to try to save a few bob
 
It was a general point that the price a builder quote depends on many variables. It seems very cheap to me but then I'm in Essex.

The principle risk of the low price is money up front, poor quality of work, searching for extras failing to complete.

It sounds as though these are not issues here so you need to decided if you want to take these risks to try to save a few bob
What risk? The risk is all his it seems.
 
If I'm presented with a vague scribble of a drawing, and the customer insists I quote to that drawing, then they will get a vague quote or an 'estimate' with caveats. I have lost count the amount of times I have declined to quote to a planning drawing (rather than a Building Regulations drawing), because the vagaries of building means that it is pointless, especially if there is a lot of structural engineer input required.
 
If I'm presented with a vague scribble of a drawing, and the customer insists I quote to that drawing, then they will get a vague quote or an 'estimate' with caveats. I have lost count the amount of times I have declined to quote to a planning drawing (rather than a Building Regulations drawing), because the vagaries of building means that it is pointless, especially if there is a lot of structural engineer input required.
The structural engineer will do the drawings for the builder to work from, no scribbling.
 
I’m surprised HM hasn’t chipped in, it’s almost certain he’s built several houses single handedly while recovering from a war wound.
 
What risk? The risk is all his it seems.
The risks that I listed: money up front, poor work, extras, absconding before completion.

Your man seems to tick these boxes but if you try to get a cheaper price from someone else they are all back in play. Don't for one minute underestimate the stress of dealing with a cowboy builder. It's bad enough with a good one.
 
I had a 6 x 3 m extension in 2019 total cost £40k, included a builder for the shell, floor but not flooring, windows, door, couple of small walls took down, new drive, removal of spoil. I organised plaster boarding and skim, new kitchen circuits and C/U, then diy kitchen and grand daughters partner for plumbing, boiler and bathroom (mates rates).
I was thinking you paid way over the odds until I noticed the "new drive" casually lobbed in!

Unless it resembles an airport runway I find £40k hard to justify, especially back in 2019 before costs shot up then kept rising.

But it's hard to compare without details such as the make/model of brick, style of roof etc.

Building regs aren't a given. Mine's an extension - but to an outbuilding, not to the house.
 
My approach is that I have drawings, but some detail is worked out as we go. But I pay the brickie by the day, not a fixed price for the job. So he doesn't need to bill me for his time spent thinking about it. Also if I make the job more complicated then he gets more money without us needing to waste time haggling about it. Keep life simple, spend time doing the job rather than thrashing out legalities. On the other hand if I set up things for him, move bricks to where they're needed etc then I pay less. It works well, but it needs trust and honesty on both sides.
 
The risks that I listed: money up front, poor work, extras, absconding before completion.

Your man seems to tick these boxes but if you try to get a cheaper price from someone else they are all back in play. Don't for one minute underestimate the stress of dealing with a cowboy builder. It's bad enough with a good one.
Im not gonna use anyone else, was just asking if the price was on point.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top