Hi
Quick one, before the shower tray goes in I am putting no more ply on the floor and aquapanel on the walls.
Which order is correct/best:
No more ply down on the floor first and then aquapanel on the walls down on top of the NMP
Or, walls first and then the NMP.
Thinking the floor first and then walls? Should I bring the Aquapanel tight on top of the NMP or leave a gap?
Many Thanks