Hello everyone.
I've read a great many threads on here this afternoon and have found it most informative.
I appreciate everything that everyone has said about searching the forum, and about the new regulations, and about competence (or lack of it). I do, however, have one or two questions that I would appreciate direct answers to. Questions that I have been unable to find answers to on this forum.
I have a new shed - 17' x 11'...
I wish to have an electrical supply to it...
I won't be doing the technical stuff myself, but I will be doing the donkey work... digging trenches, etc...
Although I'm not actually doing the technical stuff myself I would like to understand things a little better...
My main question relates to the actual supply to the shed. I've been told different things by two supposedly qualified people and I was wondering if someone could clarify for me, please...
The supply will come from a spare way in the consumer unit of the bungalow. 6mm T&E will go up into the loft, through the loft to a junction box where it joins 6mm 3 core SWA. This runs down the wall of the bungalow and through a trench to the shed approximately 40 metres away, and terminates in a suitable consumer unit. The conflicting information I've received is this... one person says that the supply then needs to return to the bungalow consumer unit creating a 'ring', and the other says it just terminates in the shed CU. If it has to return to the bungalow CU that will obviously be a considerable amount of extra SWA.
Can anyone tell me which is correct, please?
Thanks very much,
Paul
P.S. There were other questions, but I can't think what they were now. Perhaps they were answered during the course of my thread reading this afternoon.
I've read a great many threads on here this afternoon and have found it most informative.
I appreciate everything that everyone has said about searching the forum, and about the new regulations, and about competence (or lack of it). I do, however, have one or two questions that I would appreciate direct answers to. Questions that I have been unable to find answers to on this forum.
I have a new shed - 17' x 11'...
I wish to have an electrical supply to it...
I won't be doing the technical stuff myself, but I will be doing the donkey work... digging trenches, etc...
Although I'm not actually doing the technical stuff myself I would like to understand things a little better...
My main question relates to the actual supply to the shed. I've been told different things by two supposedly qualified people and I was wondering if someone could clarify for me, please...
The supply will come from a spare way in the consumer unit of the bungalow. 6mm T&E will go up into the loft, through the loft to a junction box where it joins 6mm 3 core SWA. This runs down the wall of the bungalow and through a trench to the shed approximately 40 metres away, and terminates in a suitable consumer unit. The conflicting information I've received is this... one person says that the supply then needs to return to the bungalow consumer unit creating a 'ring', and the other says it just terminates in the shed CU. If it has to return to the bungalow CU that will obviously be a considerable amount of extra SWA.
Can anyone tell me which is correct, please?
Thanks very much,
Paul
P.S. There were other questions, but I can't think what they were now. Perhaps they were answered during the course of my thread reading this afternoon.
