Hi
We are having our house, a 3 bed detached bingalow renovated. What approx cost (average) would we expect taking on board this is not a complete rewire, for Labour + Labour/Supplied.
New Mains Fusboard
New wiring circuit for lights and 8 appliances for kitchen (details conatined within the below)
Fsue Spur/s for new combi boiler + Megaflo water tank.
Wiring + Central Ceiling 2
Wiring + Pendant Lights 6
Wiring + Dimmable 17 Fire Rated Daylight LEDS +
Wiring + Wall Lights 21
Wiring + LED rope light
Wiring + Wall Units * 3
Wiring + 15 Dimmer Switches
Wiring + 2 Sensors for lights in Utility/wardrobe areas
Wiring + 31 twin sockets
Wiring + 5 Single sockets (3 * Ovens + 2* fridges)
Wiring + Pop up worktop socket
Wiring + 3 Shaving Points
Wiring + 3 Hairdryer points
Wiring + 3 heated/Lit mirrors
Wiring + 6 televison points + Digital aerial.
Thanks,
Paul
We are having our house, a 3 bed detached bingalow renovated. What approx cost (average) would we expect taking on board this is not a complete rewire, for Labour + Labour/Supplied.
New Mains Fusboard
New wiring circuit for lights and 8 appliances for kitchen (details conatined within the below)
Fsue Spur/s for new combi boiler + Megaflo water tank.
Wiring + Central Ceiling 2
Wiring + Pendant Lights 6
Wiring + Dimmable 17 Fire Rated Daylight LEDS +
Wiring + Wall Lights 21
Wiring + LED rope light
Wiring + Wall Units * 3
Wiring + 15 Dimmer Switches
Wiring + 2 Sensors for lights in Utility/wardrobe areas
Wiring + 31 twin sockets
Wiring + 5 Single sockets (3 * Ovens + 2* fridges)
Wiring + Pop up worktop socket
Wiring + 3 Shaving Points
Wiring + 3 Hairdryer points
Wiring + 3 heated/Lit mirrors
Wiring + 6 televison points + Digital aerial.
Thanks,
Paul