That style can haveDo we reckon the old earth block has just been butted up against the cutout or is there a PME like connection ?
1 earth block connected to the neutral with an internal link for TN-C-S
2 separate N&E with the E conductor inside the cutout for TN-S.
3 the block removed completely for TT supplies.

