simply I read that once an electrical job is complete and 6 months has passed you no longer need to send off the certificates to building control, is this correct or just a gossip?
secondly (for example) if I carried out a job without notifying building control etc could I then get someone to carry out a PIR to overcome not notifying building control in the 1st place or again is this gossip?
secondly (for example) if I carried out a job without notifying building control etc could I then get someone to carry out a PIR to overcome not notifying building control in the 1st place or again is this gossip?