The henleys off the Main switch in Double Insulated
Two twin and earths coming off the henleys.
One is Feeding an rcd rather than a Rcbo
 
Sponsored Links
Has the 'installer' even managed to split the stranded CPC to link it to both the old rewireable CU and the new RCD enclosure? :LOL: There's certainly something odd going on with the earthing below those henleys. Either that or it's just both CPCs through one sleeving. In any case, an A1 install apart from that!
 
I think the henleys are doubled off the incomer on the main CU (if you look closely there's two tails into it) then the two T&E's from the henleys feed the mini CU and switchfuse. Im guessing the main supply comes into the main CU through the wall from a meter box outside?

Edit - I wouldnt mind betting that the tails into the henleys used to feed the metal clad switchfuse until the mini CU for the shower was added.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top