I am putting some new suspended 6ft twin lights in to my workshop, I already have conduit running to the roof above where the light will be hung but what is the correct way to run the cable from the conduit that ends at the roof down to the light? (light will be about 18" lower than the roof)
I have seen the cable just cable tied to the jack chain but I doubt this is the correct way?
I have seen the cable just cable tied to the jack chain but I doubt this is the correct way?