There is a certain element of irony in that, if the only things written are a requirement for meter tails >3m to be protected by a fuse and an effective prohibition of installing a fuse at the upstream end of those cables!All that is written is the 3m maximum tail length and that customer equipment is not allowed in the box!
Kind Regards, John