Hi i'm fitting the pipe work for this boiler and was wondering were the pipe work exits the jig the pipe work can be routed either behind the boiler to go up or below the boiler to go down, is it exeptable to do both as in instead of a 90 bend for the pipe have a tee so it goes both up behind the boiler and also down below the boiler to supply differant needs.