Hi, just getting a bathroom fitted and apparently the guy will finish tomorrow, but had a quick look round and a few issues making me a little concerned. And don’t want to jump to conclusions as I know many things are sorted when they get tweaked at the end, but:
*there is a cut in one of the panels, it’s between two units, not sure how it would be sorted (presume the panel is reversible so not sure why that wasn’t done to hide it)
*bottom of one of the doors looks like the edge has been damaged somehow (if it was like that out of the box surely he should have told me, along with the cut in the laminate I now have concerns!)
*the end of the Plinth, the cut has made a dogs breakfast of the edge, assume caulking would cover that, but it’s quite a big gap and not a lot of play to being the gap together !
*the units seem to have been fixed on the wall quite high (he has sealed the worktop to the wall already), the toilet unit has a large gap under, the plinth has the large gap on the top (under the units). Hoping he will adjust the units tomorrow. He did install the units before the laminate (karndean) floor was down.
Should I be bringing (some/ all) these things up now, or wait til he has finished?! Unfortunately I am in the office most days so won’t get the chat with him (and the missus doesn’t was to challenge him (though he is no way threatening or anything!))
*there is a cut in one of the panels, it’s between two units, not sure how it would be sorted (presume the panel is reversible so not sure why that wasn’t done to hide it)
*bottom of one of the doors looks like the edge has been damaged somehow (if it was like that out of the box surely he should have told me, along with the cut in the laminate I now have concerns!)
*the end of the Plinth, the cut has made a dogs breakfast of the edge, assume caulking would cover that, but it’s quite a big gap and not a lot of play to being the gap together !
*the units seem to have been fixed on the wall quite high (he has sealed the worktop to the wall already), the toilet unit has a large gap under, the plinth has the large gap on the top (under the units). Hoping he will adjust the units tomorrow. He did install the units before the laminate (karndean) floor was down.
Should I be bringing (some/ all) these things up now, or wait til he has finished?! Unfortunately I am in the office most days so won’t get the chat with him (and the missus doesn’t was to challenge him (though he is no way threatening or anything!))