Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Looking for a smarter way to manage your heating this winter? We’ve been testing the new Aqara Radiator Thermostat W600 to see how quiet, accurate and easy it is to use around the home. Click here read our review.
Depends on what has been agreed in the work beforehand. It could be just a visual inspection with everything else as a limitation or it can be a full PIR where all cable runs are inspected fully, all circuits tested completely with any sensitive equipment and fixed loads being removed.
Lets assume a full PIR:
All cables runs inspected for damage and wiring methods, location, suitability/overheating
All accessories inspected for damage, location, suitability/overheating
Protective devices checked for correct suitability/rating
Main earthing/protective bonding checked
Circuit cpc continuities checked
Ring final circuits checked
Insulation resistance checked
Seperation of circuits checked
Polarity of supply and circuits checked
Ze checked
Zs of circuits checked
RCD times checked
Functional checks
FAO Ban all Sheds - To be honest I thought I had lost the plot !! I was sure that I had put this post up but couldnt find it !!! Thanks Mr. GOD .......
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local