At least they have the machinery to handle it.I much prefer letting farmers pull in their own armoureds. Last one I did(n’t) was 120m of 70mm² 4 core!
At least they have the machinery to handle it.I much prefer letting farmers pull in their own armoureds. Last one I did(n’t) was 120m of 70mm² 4 core!
Those large sized SWAs are an absolute pig to manoeuvre.
Bagged up immediately after pic taken.Careful with those asbestos flash pads!
The 2 pieces shown are only about 4-5 ft long from inside the buildings and test fine, almost as soon as the cable was powered down the 100 plus metres was being chopped into handleable sized lengths and chucked into a dumper truck so we never stood a chance to look at it.Can you see any obvious damage to the cable, or is it an internal breakdown?
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local