Advice on EICR failure C2

In my entire three decades, I only ever got called out to one consumer unit that started melting then smouldering due to a loose connection on a shower MCB.
 
In my entire three decades, I only ever got called out to one consumer unit that started melting then smouldering due to a loose connection on a shower MCB.

I witnessed one when I was a student. The landlord had upgraded the shower over the summer; one of the flatmates was using the shower for the first time and the rest of us smelt a burning plastic smell from the cupboard under the stairs. On opening the cupboard door, we saw a molten plastic CU, with the plastic literally dripping off and the bus bar exposed.
 
In my entire three decades, I only ever got called out to one consumer unit that started melting then smouldering due to a loose connection on a shower MCB.
I think I agree with that, the overheating always seem to be the isolators loose joints.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top