Hi
I have dug out a small area in the bathroom where the toilet was located so i could move the wc pan connection closer to the wall. I have now done this, what sand/cement ratio is required to fill the area back up? is it 3:1? and what type of sand, sharp sand, building sand or ballast?
cheers
I have dug out a small area in the bathroom where the toilet was located so i could move the wc pan connection closer to the wall. I have now done this, what sand/cement ratio is required to fill the area back up? is it 3:1? and what type of sand, sharp sand, building sand or ballast?
cheers