We are just getting prices for our extension.
A local Drywall firm is putting a quote together to cover all of the walls and ceilings for us. They have suggested that just applying drywall (plasterboard) and taping/filling the joints is becoming an increasingly popular and costs effective way of doing it. We can apply a paint type stuff afterwards that will help harden the paper if we are concerned about durability.
Can anyone give me the advantages/disadvantages or any other comments on whether we should just leave it drywalled or have a 3mm skim over the top after?
NB - We will be using moisture resistant board in the shower room and foil backed in the loft and external solid wall.
A local Drywall firm is putting a quote together to cover all of the walls and ceilings for us. They have suggested that just applying drywall (plasterboard) and taping/filling the joints is becoming an increasingly popular and costs effective way of doing it. We can apply a paint type stuff afterwards that will help harden the paper if we are concerned about durability.
Can anyone give me the advantages/disadvantages or any other comments on whether we should just leave it drywalled or have a 3mm skim over the top after?
NB - We will be using moisture resistant board in the shower room and foil backed in the loft and external solid wall.