Can I just check the correct earth bonding requirements.
Am I correct in saying there should be:
A single uninterupted connection between the earth sheathing on the incoming supply and the mains water inlet (600mm consumer side of stop-cock), this to be linked to the hot water pipe but not the sink.
+
A single uninterupted connection between the earth sheathing on the incoming supply and the cold water water supply in the bathroom, this to be linked to the hot water pipe.
+
The link between supply & CU.
& NO link to the gas supply.
Also what is the required cable size?
Appreciate any advise (other than the politically correct industry statement of get a pro sparky in).
Am I correct in saying there should be:
A single uninterupted connection between the earth sheathing on the incoming supply and the mains water inlet (600mm consumer side of stop-cock), this to be linked to the hot water pipe but not the sink.
+
A single uninterupted connection between the earth sheathing on the incoming supply and the cold water water supply in the bathroom, this to be linked to the hot water pipe.
+
The link between supply & CU.
& NO link to the gas supply.
Also what is the required cable size?
Appreciate any advise (other than the politically correct industry statement of get a pro sparky in).