- Joined
- 28 Apr 2004
- Messages
- 8,346
- Reaction score
- 964
- Country

Just carried out an EICR on a holiday let, rewired 2013, cracking job very tidy work, removed a few brushed steel light switches and the flying CPC has been omitted to the faceplate, ok so the switch will be earthed by the screw/fixed lug method but I am tempted to give a C2 for this, am I being harsh ?