Hi,
I am trying to get a CU changed from economy7 to full day rate so I can use it to power sockets etc outside.
The guy from the power company came over this morning and said he had been told to remove the economy7 time-switch, making the CU redundant.
As I expected the person on the phone didnt understand what I wanted doing and so the guy left as he wasnt allowed to change the work spec.
He did say though that the power company wouldnt change the meter tails and I would have to get an electrician, however I know that the power company is required to break the seals on the main fuse and henley block.
Does this mean that if I called the company back, all they would do is remove the fuse, then I would have to change the tails, then call them back to replace and reseal it?
I am trying to get a CU changed from economy7 to full day rate so I can use it to power sockets etc outside.
The guy from the power company came over this morning and said he had been told to remove the economy7 time-switch, making the CU redundant.
As I expected the person on the phone didnt understand what I wanted doing and so the guy left as he wasnt allowed to change the work spec.
He did say though that the power company wouldnt change the meter tails and I would have to get an electrician, however I know that the power company is required to break the seals on the main fuse and henley block.
Does this mean that if I called the company back, all they would do is remove the fuse, then I would have to change the tails, then call them back to replace and reseal it?