I moved into 3 bed semi about a month ago.
The place has been build in 1960's but nothing been touched since.
The electrics is outdated with just one socket per room and no consumer unit.
As the budget is pretty low at the moment I don't mind putting some work myself like doing the channeling and the dirty work.
I had a chap around for a quote but I felt it is too much .
Here is the breakdown :
Final Price: £5560
£840 to be taken off if supplying own materials
£500 to be taken off if wall chasing is done by client
Price Includes:
19 Double Sockets
8 Pendants
1 IP Rated Light Fitting (Bathroom)
2 6” Flu Fitting (Garage)
9 Switches
1 Pull Cord
1 4” Extractor Fan (Bathroom)
1 Cooker Point /Extractor Supply/ Junction
17th Edition Fuse Board
Gas and Water Bonding
Smoke Detector System
Full NICEIC Certification
Notification to Building Control
Do you think the price is fair ?
The place has been build in 1960's but nothing been touched since.
The electrics is outdated with just one socket per room and no consumer unit.
As the budget is pretty low at the moment I don't mind putting some work myself like doing the channeling and the dirty work.
I had a chap around for a quote but I felt it is too much .
Here is the breakdown :
Final Price: £5560
£840 to be taken off if supplying own materials
£500 to be taken off if wall chasing is done by client
Price Includes:
19 Double Sockets
8 Pendants
1 IP Rated Light Fitting (Bathroom)
2 6” Flu Fitting (Garage)
9 Switches
1 Pull Cord
1 4” Extractor Fan (Bathroom)
1 Cooker Point /Extractor Supply/ Junction
17th Edition Fuse Board
Gas and Water Bonding
Smoke Detector System
Full NICEIC Certification
Notification to Building Control
Do you think the price is fair ?