Going to lay a paved drive soon. Nothing special just two lines of slabs straight ahead and two coming off at a slight angle as we have two cars. The slabs l have are only 38mm thick. Therefore l plan to dig down around 200mm and lay a concrete base, under the four lines of slabs. Then sand on top of this and finally slabs. Does this sound reasonable, any tips?