- Joined
- 11 Jan 2004
- Messages
- 45,889
- Reaction score
- 3,519
- Country

This guy is advertising here.
http://www.smartgroupuk.co.uk/index.html
His speeling is atroshus and his bathroom diagram still has Z3 in, despite his assurance that he is now working to 7671:2008.
He states, "All our boards are fitted and tested using the latest Calibrated equipment so that we can check that the RCD units will switch off in time if there is a fault."
A bit more than that, I hope!
"To install a power shower you must remember that it needs to following:
RCD Breaker for Shower
45Amp Dual Pole Isolation Switch
Correct rated cable ( at least 6mm )"
A power shower?
Can an 11.5kW shower be fitted with a 45A switch?
You think the guy would have at least got someone to proof-read stuff before uploading it...
http://www.smartgroupuk.co.uk/index.html
His speeling is atroshus and his bathroom diagram still has Z3 in, despite his assurance that he is now working to 7671:2008.
He states, "All our boards are fitted and tested using the latest Calibrated equipment so that we can check that the RCD units will switch off in time if there is a fault."
A bit more than that, I hope!
"To install a power shower you must remember that it needs to following:
RCD Breaker for Shower
45Amp Dual Pole Isolation Switch
Correct rated cable ( at least 6mm )"
A power shower?
Can an 11.5kW shower be fitted with a 45A switch?
You think the guy would have at least got someone to proof-read stuff before uploading it...