Just wanted to knock this one about;
Having been in touch with the NIC helpline about bonding surface clipped gas installations fed from LPG cylinders (NOT EXTRANEOUS AND HENCE NO NEED TO BOND!!),
what are your opinions on a mains gas installation fed via poly pipe to the meter (externally mounted) and from there surface clipped, and thru wall, to a boiler and oven??
To me they are exactly the same!!