for the job to be done well, 15k is a drop in the bucket.
you posted up 80kw worth of rads, the system is not going to be a rule of thumb job or a make it up are you go along job.
its all going to need to work out before hand.
you posted up 80kw worth of rads, the system is not going to be a rule of thumb job or a make it up are you go along job.
its all going to need to work out before hand.