I want to lay a thick concrete slab to act as a base to a telescope. The slab is to be about 700*700*600 deep. I've dug the hole to the correct dimensions and now ,because of all the rain, I have a fish pond!
Is there any way I can pour the concrete without waiting for the water level to drop. Pumping out is no use as it fills up straight away. Is lining the hole with polythene and then pouring an option?