- Joined
- 2 Feb 2007
- Messages
- 105
- Reaction score
- 0
- Country
Hi
I'm replacing a length of 2.5 cable to a socket where it has been drilled though (previous owners i will add), is there a requirement for the wires to be twisted together when terminated?
thanks.
I'm replacing a length of 2.5 cable to a socket where it has been drilled though (previous owners i will add), is there a requirement for the wires to be twisted together when terminated?
thanks.