I attended a job today (for something different) and noticed the boiler had been wired up using the existing flex and the flex that comes pre-wired to the boiler joined using connector blocks and wrapped with insulation tape, on show. I presume it was a “permanent” fixture as the boiler was installed last year.
Can anyone confirm if this is allowed/acceptable?
Thanks.
Can anyone confirm if this is allowed/acceptable?
Thanks.