Accountants running companies will always look for ways to "be more efficient".
Bottom line of that is invariably: you either do the same work with fewer people so you can sack them, or you do the same work with the same amount of people, but find ways to pay them less.
Two ways of doing that: you trim at the top, or you trim at the bottom.
hit the nail on the head benga
scumbags everywhere.
scottish and southern energy hydro have just shat all over their engineers.
they are run by sales people who are slimey *******s.
they sent out letters to all engineers telling them to either sign new contracts accepting new shift patterns or they would be sacked. 36 hours in summer with 44 to be worked in winter with a weekend to be worked once a month with the option of forcing you to work 2 in a month. no consultation just straight forward threatining behaviour.
the new shifts mean that engineers are required to work late shifts up to 8pm which means a stop to most overtime. with most emergencys after this point being booked in for the next day unless water leak.
so now the on call money has been cut by £50.
sales leads commission has been cut in half. everyone in the company was given a 4% pay rise apart from the engineers instead they have introduced performance related pay for the engineers based on the amount of sales/remedial work you generate in a 3 month period. the top amount which is unachievable. now after these bully boy tacticts the engineers from the fear of losing their jobs signed the contracts. now bear in mind the preformance related pay was started before we even knew about the new contracts. so when guys were awarded bonuses based on there performance, the guys who took a few weeks to sign their contracts were docked a precentage of their bonuses because they never signed straight away.
and it gets better if at the first visit chargeable work is required the engineer is to first give the customer a full quote then if that is refused we then have to offer a discount then if that is refused we can then exclude parts from the contract if this is then refused they then send a lead engineer out to try and convince the customer. the moves by sse management have demorolised the workforce, sales men who have never been on the tools making decisions for engineers.
you think that after all the bad press of dodgy salesmen they would have learnt but instead put one of the drippy cants in charge of the whole gas side to try n make a profit so i had enough and left.