Running several metres from boiler to cylinder cupboard and relays, he has used white flexible cable rather than grey 2 core + earth as I would expect. He has also joined the black cable from the Y plan motorised valve into this wiring using simple crimped connectors within the plastic conduit, where I would expect to find a proper juction box.
Should I get him back to put this right?
Should I get him back to put this right?
