customer wants me to rip out old gas boiler and replace with cylinder and leccy flow boiler, the spark i use is being real slow about getting back to me..
basically the spec is 1x3kw immersion and 1x12kw flow boiler.
i just want to know how feasible it is to add this kind of draw to this consumer unit and roughly whats involved.
https://www.dropbox.com/s/o3vj0wwc0u3ugq1/20130319_151559.jpg
basically the spec is 1x3kw immersion and 1x12kw flow boiler.
i just want to know how feasible it is to add this kind of draw to this consumer unit and roughly whats involved.
https://www.dropbox.com/s/o3vj0wwc0u3ugq1/20130319_151559.jpg