OK, but that seems to be referring to a lightning protection system, not necessarily anything to do with an electrical installation.
Do you not have TT electrical installations (in which the local earth electrode may be the installation's only 'earth') in your country?
Indeed I can - 3 minutes is very different from 73 minutes, but you did not previously give me that guidance! However, as above, I suspect that I may find myself listening to material about lightning protection systems, not the 'earthing' of an electrical installation.